Handan Shengnada New Material Technology Co., Ltd. andy@sndatech.com 86--198 3265 7175
Handan Shengnada New Material Technology Co., Ltd. company profile
Products
Home > Products > Cast Iron Manhole Cover > D400 EN124 Standard 700x700x100mm Round Ductile Iron Manhole Cover for Heavy Duty Urban Roads

D400 EN124 Standard 700x700x100mm Round Ductile Iron Manhole Cover for Heavy Duty Urban Roads

Product Details

Place of Origin: Handan, China

Brand Name: SND Foundry

Certification: ISO / CE

Model Number: SND Manhole Cover

Payment & Shipping Terms

Minimum Order Quantity: 10 tons

Price: $50-90/t

Packaging Details: wood pallet/ bulk

Delivery Time: 45 days

Payment Terms: L/C,T/T

Supply Ability: 20000 tons per year

Get Best Price
Chat Now
Product Details
Highlight:

D400 Cast Iron Round Manhole Cover

,

Cast Iron Round Manhole Cover EN124

,

EN124 Ductile Iron Manhole Cover

Product Name:
European Standard EN124 Pressure Grade D400 Cast Iron Round Manhole Cover
Key Words:
Manhole Cover And Frame
Sizes:
700*700*100mm
Class:
D400
Pattern:
As Drawing
Paint:
Spray Paint,
Standard:
EN124
Material:
Ductile Iron
Product Name:
European Standard EN124 Pressure Grade D400 Cast Iron Round Manhole Cover
Key Words:
Manhole Cover And Frame
Sizes:
700*700*100mm
Class:
D400
Pattern:
As Drawing
Paint:
Spray Paint,
Standard:
EN124
Material:
Ductile Iron
Product Description
D400 Cast Iron Round Manhole Cover EN124 Ductile Iron Manhole Cover
European Standard EN124 Pressure Grade D400 Cast Iron Round Manhole Cover

This high-quality cast iron manhole cover meets EN124 standards with D400 pressure rating, designed for durability and heavy-duty performance in municipal and industrial applications.

Installation Process (Municipal Road Application)
1. Construction Preparation
  • Materials and tools: D400 round cast iron manhole cover, manhole ring, C25+ grade concrete, reinforcement bars (if required), level, vibrator, cutter, wrench
  • Site survey: Verify well opening dimensions, clear debris, check wellbore flatness/verticality. For soft foundations, use graded gravel + medium coarse sand (compaction density ≥95%)
2. Foundation Treatment & Frame Installation
  • Frame positioning: Align frame edges with well opening, level within ≤2mm tolerance
  • Concrete pouring: C25 concrete (width ≥300mm, thickness ≥150mm) around frame with vibration compaction
  • Anchor bars: Use "U"/"L"-shaped threaded bars (diameter ≥12mm) in frame reserved holes
  • Elevation control: Use cross-method measurement for precise road surface alignment
3. Cover Installation & Fixation
  • Placement: Install after concrete curing (7 days minimum), ensure proper fit without gaps
  • Security: Tighten bolts or install special locks to prevent movement/theft
4. Final Inspection & Acceptance
  • Water-tight test: For rainwater/sewage wells, test at upstream pipe top + 2m head (seepage ≤0.0046×D)
  • Pavement restoration: Match surrounding surface (asphalt or concrete) for smooth transition
  • Final check: Verify no looseness, abnormal sounds, and proper load-bearing capacity
Note: Installation requirements may vary for soft foundations and heavy-load industrial areas. Always follow project specifications and engineering drawings.
D400 EN124 Standard 700x700x100mm Round Ductile Iron Manhole Cover for Heavy Duty Urban Roads 0 D400 EN124 Standard 700x700x100mm Round Ductile Iron Manhole Cover for Heavy Duty Urban Roads 1
Contact us for special pricing - Available 24/7 for inquiries and orders.